Wednesday 25 January 2017

Muirburn Code Review


As the date for completing the review and the dates of the stakeholder workshops draw closer, the review is entering its final phase and the level of activity is increasing, as a result.

For more information about the review, see the Muirburn Code blog.  The latest post reflects the discussion that took place during the Steering Group meeting held on 25 January.

This is a link to the flyer for the workshops, which will aim to capture views from those with experience of muirburn, including cutting.


No comments:

Post a Comment